Skip to main content

About your Search

20100901
20100930
Search Results 0 to 3 of about 4
of using the express lane along 680. $1 that is going to change depending on congestion. here along the highway, between southbound 680, senole grade. 14 miles worth of highway, this is how things will look as you drive through, a half mile before each entrance, toll pricing sign, tolls vary depending on congestion. fact tract trance ponder will fact transponder will be read and you cannot exit until you get to mission. chp officers will be out in full force making sure drivers understand. sergeant cross with the california highway patrol, what do you anticipate as the day goes on? >> we anticipate initially there may be confusion but we will have extra officers working the area to be a visible presence as well as conduct enforcement. we highly recommend that spend an extra 10 minutes, do research as far as ins and outs of these express lanes so you are more comfortable. >> what are you looking for as far as making sure people don't cross the lines? >> yeah, the biggest thing, just have that invisible presence, more officers in the area. we want to ensure it is moving smoothly and a
this section that water had shown up in tests. the key to fighting this corrosion apparently using chemicals or robots to scrape microbes away but apparently pg&e says the pipeline in san bruno was too narrow and had too many bends for some of the recommended treatments. pg&e said it did use ultrasonic techniques to detect corrosion and didn't find any. meanwhile, the public utilities commission has voted to bring an independent panel in to investigation this explosion, looking into what pg&e and state agencies could have done to avoid the disaster. state leaders are pushing to make sure pg&e pays for the cost of the panel out of its own profits so customers do not have to foot the bill. today is day 2 of heavy demolition an clean-up in the neighborhood what remains of the 35 homes that were burned to the ground will be removed over the next several weeks. large excavators and workers in protective gear are working on three homes a day. at the same time, street sweepers and water trucks work to keep the area clean by reducing the threat of toxic dust. >> want to make sure that we're very and
.m. >>> meg whitman has now spent more of her own money on her campaign than any politician in u.s. history. the former head of san jose- based ebay just contributed another $15 million to her run for governor of california. the running total of her personal donations, $119 million. that is more than the previous record set by new york city mayor michael bloomberg. >>> the california teachers association has made changes to a television ad criticizing whitman. >> whitman says we should cutted another $7 billion from our schools, teacher layoffs 100,000 more, 33% larger class size. >> that's a clip from the original ad. campaign attorney warned tv stations they could be held liable for slanderous or libelous statements if they keep running it. cbs 5 and some other stations stopped airing that spot. >> i have never said anything like that. in fact, my third priority is education. >> have meg tell us where she is going to get the money from, that's all we're asking. teachers want to know. >> but the ad says "meg says she is going to take $7 billion from education." >> yeah. >> she doesn't say
to be trying to find the cause for months before it's actually confirmed. but they say that they will let us know as soon as new information comes in on exactly what caused this pipeline explosion. here in san bruno, the investigation continues this morning. thousands of miles of pipeline will have to be inspected by pg&e as this investigation, of course, continues. the ntsb has been collecting evidence from around the blast site, pieces of the pipeline exploded on thursday leaving this crater in the ground in the middle of a neighborhood. the ruptured line was in a high concentration area so it should -- high consequence area, so it should get more stringent inspections. pg&e says the line was slated to be replaced according to documents. now, pieces of it have become evidence instead, including a 28-foot section ripped out of the ground and tossed 100 feet into the air by the blast. it's being shipped to washington, d.c. as part of the investigation. another big part of the investigation, whether or not there was a gas smell reported to pg&e in the days before the explosion. >> we are not
Search Results 0 to 3 of about 4